Project Experience

 

Sample of Completed Projects

Manufacturing Facility Closure, Brenham, TX – Closure of Hanger manufacturing facility.  Included Decontamination and Demolition of multiple Painting and Plating lines, Sump/Pit/Tank cleaning, Pressure washing of 175,000 sq/ft warehouse, Debris removal, and Scrap metal recycling.

Manufacturing Facility Closure, Yukon, OK – Closure of 4 Acre facility including 300,000 sq/ft building.  Removal of all hazardous materials, excavation of impacted soils, removal of oil/water separator system, removal of aboveground tanks and containments, hydroblasting entire manufacturing facility.

Manufacturing Facility Closure, Oklahoma City, OK – Closure of 2 Acre facility including 100,000 sq/ft building.  Removal of all hazardous materials, excavation of impacted soils, cleaning and removal of oil/water separator system, removal of aboveground tanks and containments, hydroblasting entire manufacturing facility.

Chemical Plant, Freeport, TX – Pond Construction and Lining – Includes dirt work to form 5 acre pond and supervision of Liner installation.

Manufacturing Facility, Houston, TX – Fire Water Pond/Pump Station Installation – Includes construction of Fire Water pond, installation of all piping and electrical, placement of diesel firewater pumps and surge tankage.

 

Sample of Works in Progress

Soil Excavation, Spring, TX – Excavate/Load/Transport/Dispose of 1000 TCY of Benzene contaminated soil.  Includes site restoration – imported backfill with compaction and concrete slab replacement.

UST Removal, Houston, TX – Removal of four 7000 gallon Underground Storage Tanks (UST), one 500 gallon waste oil tank, and 3 Hydraulic Lifts.  Includes site restoration – imported backfill with compaction and concrete slab replacement.

Manufacturing Facility Closure, Yukon, OK – Closure of 4 Acre facility including 300,000 sq/ft building.  Removal of all hazardous materials, excavation of impacted soils, removal of oil/water separator system, removal of aboveground tanks and containments, hydroblasting entire manufacturing facility.

Natural Gas Compression Facilities, East Texas Area – Field Service work consisting of pressure washing radiators, heat exchangers, “fin-fans”, and Tube Bundles.

Chemical Plant, Freeport, TX – Pond Construction and Lining – Includes dirt work to form 5 acre pond and supervision of Liner installation.

Manufacturing Facility, Houston, TX – Fire Water Pond/Pump Station Installation – Includes construction of Fire Water pond, installation of all piping and electrical, placement of diesel firewater pumps and surge tankage.